Producing potable water from Al-Khader wells in Buraidah city – to serve the residents of Al-Mulaida and Al-Shaqqa – with a total capacity of not less than 25 thousand cubic meters per day. The project units are operated and controlled remotely by means of the SCADA system and the link between the station and other stations operating under the Operation and Maintenance Department of the National Water Company.